Has Wet Insulation Across Most Of The Roof
Coating over soaked insulation traps the water, so those sections are replaced before any coating goes on.

Here is more about our Columbus metal roof coating work: how we judge a roof, what we fix before coating, and which jobs we turn down.

A few things to know about our Columbus metal roof coating work: we coat commercial and agricultural roofs only, and every job starts on the roof, with a walk and a moisture check.
We repair before we coat. Failed screws, open laps, cracked skylight panels, and wet insulation get fixed first, because a coating over a wet or loose roof traps the problem. When a roof is past coating, we tell you plainly and explain what replacement involves.
Call and describe where water shows up inside, and we will start the trace from there.
Call UsGet a planning range now, then confirm the scope on a roof walk.
Get A Free EstimateThese items go on every inspection sheet, whatever the roof system.
Coating fits many metal roofs, and these are the cases where we point you to another job first.
Coating over soaked insulation traps the water, so those sections are replaced before any coating goes on.
Rusted-through steel across much of the roof makes new panels the better call for the building.
Sagging purlins or a damaged deck are structural problems for a structural contractor to fix first.
Curling, cracked shingles across most slopes need replacement, and coating them would only delay it.
Call or get an estimate, and we will walk the roof and explain what we found.